Tosano Supermarkets

Project overview

The project involved two strategic sites with a total capacity of 2.4 MW. At the store in Montecchio (VI), 3,422 panels were installed, while the logistics centre in Cerea (VR) was equipped with 1,020 panels. The overall intervention results in a reduction in CO2 emissions of more than 1,200 tons per year.

The results, in terms of energy self-sufficiency, are significant: the Cerea logistics centre will achieve 100 percent self-consumption of the energy produced, generating more than 2 million kWh annually and covering 9% of the area's energy needs. The Montecchio store, with 90% self-consumption, will feed more than 600,000 kWh of excess green energy into the grid annually.

PV roof-top

installation

2.4 MW

of installed capacity

371 tonnes/ year

reduction of carbon emissions

Technical information
Project TypePV roof-top installation
LocationArcole, Verona
Commissioned2021
Installed capacity770 kWp
Reduction of carbon emissions371 tonnes/year
Reduction of corporate energy costs75 percent/year
Payback time4 years

Project location